111 Presidential Boulevard Parking Garage

Location: Bala Cynwyd, PA

O'Donnell & Naccarato is providing ongoing structural engineering and construction administration services for the phased restoration of the 2-story, pre-cast concrete parking garage with a cast-in-place concrete topping. Following a condition assessment of the existing 1,095,700 SF, above and below-grade structure, O'Donnell & Naccarato identified deteriorated areas and developed detailed restoration drawings and specifications. The majority of restoration work consists of precast concrete plank replacement, beam, horizontal, column, and vertical concrete repairs, expansion joint replacement, control joint replacement, and the installation of epoxy waterproof on the new top level concrete planks. During construction, the garage will remain in-use as restoration will affect only isolated areas.