355 Maple Ave. November 1, 2024 O'Donnell & Naccarato Industrial Harleysville, PA Project Overview 2 story, 250,000 SF former office facility composed of 4 different buildings from 4 different eras, converted to... Continue reading
101 County Line Road November 1, 2024 O'Donnell & Naccarato Industrial Warminster, PA Project Overview 3-story, 150,000 SF former office and manufacturing space building converted into a climate-controlled flex industrial... Continue reading
Niagara Bottling Plant November 1, 2024 O'Donnell & Naccarato Industrial Allentown, PA Project Overview O’Donnell & Naccarato provided structural design of the 320,000 SF bottled water plant and distribution that... Continue reading
Durand Glass Manufacturing Company Plant November 1, 2024 O'Donnell & Naccarato Industrial Millville, NJ Project Overview O’Donnell & Naccarato provided structural design of the 250,000 SF glass manufacturing facility, as well as... Continue reading
Coca-Cola Lehigh Valley Syrup Plant Expansion November 1, 2024 O'Donnell & Naccarato Industrial Lower Macungie Township, PA Project Overview O’Donnell & Naccarato provided structural design of the multi-phase expansion to the existing... Continue reading
Holtec International Krishna P. Singh Technology Campus October 31, 2024 O'Donnell & Naccarato Corporate, Industrial Camden, NJ Project Overview O’Donnell & Naccarato provided structural engineering design of Holtec International’s Krishna P. Singh... Continue reading